Manufacturing
From concept to closet, without leaving the group.
Seven stages, all of them ours. Here is what happens between the yarn arriving and the carton being sealed.
- ~30
- Knitting machines
- Single jersey, rib, interlock, terry, velour, fleece and jacquard
- 12+ t
- Dyed per day
- Soft-flow dyeing of knitted fabric across the group
- 500 kg
- FabricMaster capacity
- Benninger soft-flow machine commissioned March 2025
- 30%
- Faster dye cycles
- Versus our earlier setup — an extra batch every day
The make, step by step
Seven stages. One team accountable for all of them.
Most exporters buy fabric, cut it and hope. We knit the cloth, dye it, finish it, inspect it and only then cut — which is why a shade problem is ours to fix, not yours to chase.
-
01 Yarn in, fabric outKnitting
We buy yarn and knit it ourselves into the constructions a style actually needs — single jersey, rib, interlock, terry, velour, fleece and jacquards.
- Around 30 circular knitting machines
- Single jersey, rib, interlock, terry, jacquard
- Yarn traceability by lot
-
02 Colour, right first timeDyeing
Latest soft-flow machines bleach and dye the greige fabric. Only GOTS and OEKO-TEX approved dyes and chemicals go into the bath.
- Benninger FabricMaster soft-flow dyeing
- GOTS & OEKO-TEX approved dyes only
- Automated add-tank chemical dosing
-
03 Stable, soft, on-specFinishing
Stentering and compacting dry, heat-set and stabilise the fabric width — the step that controls shrinkage, hand-feel and appearance.
- Stentering, heat-setting and compacting
- Width and shrinkage control
- Softness and surface finish
-
04 Before a single cutFabric inspection
Every dyed lot is checked for colour consistency, GSM, width and strength before it is allowed anywhere near the cutting table.
- 4-point inspection
- Shade continuity across lots
- GSM, width and strength checks
-
05 Marker to bundleCutting
Lays are cut to marker and bundled by size and shade, so the sewing floor never has to guess which panel belongs to which garment.
- Marker planning for fabric yield
- Shade-banded bundling
- Panel checking before issue
-
06 Juki, JapanSewing
Flat lock, over lock and lock stitch machines — all Juki, all fitted with automatic thread trimming and dust collection.
- Flat lock, over lock, lock stitch
- Auto thread trim and dust extraction
- In-line checkpoints at every operation
-
07 Nothing leaves uncheckedChecking & packing
Final checking catches damages and measurement deviations. Garments are then pressed, folded and packed to the buyer’s carton spec.
- 100% final inspection
- Measurement and needle checks
- Buyer-specific folding and carton spec
Quality assurance
Six gates between yarn and carton.
Multi-stage inspection is the only reason a vertically integrated factory is worth more than a cheap one. Every gate below is documented and traceable to a lot.
- 01
Yarn in
Lot-wise yarn receipt, count and blend verification before knitting begins.
- 02
Greige audit
GSM, width and knitting-fault checks on the grey fabric roll.
- 03
Shade approval
Lab dip, bulk shade and continuity of shade across the full order.
- 04
4-point inspection
Dyed and finished fabric graded before it is released to cutting.
- 05
In-line checks
Operation-wise checking on the sewing floor, not only at the end.
- 06
Final audit
100% checking, measurement, needle and metal detection before packing.
On the floor
The plant, as it actually looks.
No stock photography. These are the machines your order runs on.





Sampling
Send us something to make.
A tech pack, a photo, or a garment in the post. We will knit the fabric, sew a proto and tell you honestly what it will cost to do properly.